Darbhanga: A significant relief initiative was launched on Saturday for the residents of the Kusheshwarsthan region, who are frequently affected by floods from the Kamala Balan River. Prime Minister Narendra Modi inaugurated Phase 3 of the Kamala Balan Western Embankment via a live broadcast from an event held in the Jafar Patti industrial area of Vaishali.
Under this project, a 17.29-kilometer-long stretch of the embankment—from Palwa to Fuhiya—has been raised, strengthened, and paved at a cost of Rs 255.45 crore. This is expected to provide flood protection to 20 panchayats across the Kusheshwarsthan East and West blocks. The enhanced strength of the embankment will prove crucial for a large local population whenever the water level of the Kamala Balan River rises.
The construction of a paved road along the embankment will also alleviate transportation challenges during the rainy season. It will facilitate easier access to the block headquarters and local markets, while also improving connectivity toward Madhubani, Jaynagar, and Nepal. This better road infrastructure is expected to provide a boost to trade, education, and the rural economy.
The inauguration event, held near the Usri Bridge, was attended by SDO Shashank Raj, Executive Engineer Ghulam Gas, BDO Prabha Shankar Mishra, and CO Rakesh Roshan Bharti, alongside various public representatives and a large number of local residents. The people of the region are hopeful that the strengthening of the embankment will provide significant relief from the long-standing problems of flooding and transportation difficulties.







